Parkhead View

Portfolio / Wet Rooms

These works consist of the strip out of the entire bathroom, builder works, joinery works, plumbing, drainage, heating, electrical, ventilation, floor coverings, wall boarding, ceiling cladding plaster works and decorating. Once completed this give an accessible Toilet / shower room that is impervious to water, with a floor level shower area.

Before..

After..